Mae Fah Luang Foundation under Royal Patronage Project

Cover

Cover

Project Name: Mae Fah Luang Foundation under Royal Patronage Project
Client Category: Government Agency
Description: The dishwashers in the cafeteria area primarily utilize hot water generated by gas. PAC Frenergy heat recovery water heaters were implemented to pre-heat the water system for these gas-powered dishwashers. This significantly reduces energy consumption and operational costs by utilizing waste heat from air conditioning units that operate throughout the day. Furthermore, this system helps reduce the workload of the air conditioning units themselves.

Frenergy

– Model PAM 1002
– Capacity (Ltr.) 100
– Quantity Installed: 1 Unit

Share the Post: