CP Ram Chiang Mai

Cover

Cover

Project Name: CP Ram Chiang Mai

Client Category: Food Industry Factory

Product Details: Installed three 100-liter PAC Frenergy heat recovery water heaters to replace electric boilers. Annual electricity costs were reduced from 300,000 THB to 80,000 THB. With an investment of 50,000 THB, the payback period is approximately 6 months.

Share the Post: