
Project Name: Serenity Hotel & Spa
Client Type: Hotels & Resorts
Details: Product Installation
– PAC Hybrid Aire (33 kW) installed in the hotel lobby, offices, and first-floor restrooms.
– PAC Hybrid Plus (Water Heating Model) (28 kW) installed at the front reception desk and one office.
– Hot water system powered by the air conditioning system, utilizing two 2,000-liter tanks to supply the building and guest rooms.









